NAEDRA™

the North American End Device Registration Authority™

The North American End Device Registration Authority ANSI C12.19 / IEEE P1377, Utility Industry End Device Data Tables and ANSI C12.22 / IEEE P1703, Protocol for Interfacing to Data Communication Networks

Committee Documents Relevant to the
on-going work of NAEDRA
Document Name
Author
Category
Abstract
NAEDRA Committee
Document

This Policies and Procedures document outlines the orderly transaction of business of the Object Identifier (OID) NAEDRA Committee (“Committee”).

Certification Requirements for Registrar TDL v1.0 2012-03-30 (PDF)
FutureDos, Inc. & KEMA, Inc.
Document

This document defines requirements for testing a submission of a TDL/XML Form representation of the ANSI C12.19-2008, as corrected by IEEE P1377-2010 and revised by IEEE Std 1377-2012 and ANSi C12.19-2012.

The ANSI C12.19 Standard binds a C12.19 Device Class to an End Device Operating Model. The C12.19 Standard semantics of the Data Model are defined by the standard in two forms:

1. The Document Form (Annex G: Document-form Descriptive Syntax); and

2. The XML Form (Annex I: XML File Format of TDL and EDL Files).

The Document Form is used to publish the Standard in a human readable and comprehensible form. The XML Form is used to publish the same information in a machine readable form.

This document (v1.0) provides a simple testing/verification process to be used by a NAEDRA accredited tester for the purpose of testing and certifying Registrar TDLs.

NAEDRA Committee
Letter

Letter from FutureDos, Inc. requesting to begin operations.

NAEDRA Committee
Letter

Letter to FutureDos informing that the application to become a Registrar has been accepted and approved by the NAEDRA committee.

KEMA's Letter Of Invitation - 03-08-10 (PDF)
NAEDRA Committee
Letter

Letter to KEMA, Inc. (Mr. Harry Stephey, Principal Consultant) extending an invitiation to become "a" certification agency.

KEMA's Acceptance Letter 05-12-10 (PDF)
KEMA, Inc.
Letter
Letter from KEMA, Inc (Mr. Ronald J. Chebra, Director, AMI Practice) accepting the invitiation from NAEDRA to become "a" certification agency.
NAEDRA's Authorization Letter to KEMA To Begin Work with FutureDos (PDF)
NAEDRA Committee
Letter
Letter of authorization from NAEDRA to KEMA, Inc. (Mr. Harry Stephey) to begin work with FutureDos, Inc. on creating the Registrar certification process needed to support the interoperability objectives for metering, instrumentation and other End Device functionality.

NAEDRA's Authorization Letter to FutureDos To Begin Work with KEMA (PDF)

NAEDRA Committee
Letter
Letter of authorization from NAEDRA to FutureDos, Inc. (Dr. Avygdor (Avy) Moise) to begin work with KEMA, Inc. on creating the Registrar certification process needed to support the interoperability objectives for metering, instrumentation and other End Device functionality.

(Last Page Update: November 2013)

For information about the OID Oversight Committee contact NAEDRA™.

Copyright © 2007-2013, North American End Device Registration Authority™